Foundations, framing, crane days, and pool construction, photographed by our crews and our own drone while the work was happening. Finished homes and kitchens are on the projects page.
Short clips from our own drone. They load when you press play.
Setting trusses. A crane truck lifts roof trusses to the crew on top of the framed walls.Framing with the crane. A drone circles a framing crew and the crane truck as the roof framing goes up.Truss bundle at the hook. The crane hook comes down to a bundle of roof trusses on the flatbed, with the framed walls behind.Trusses beside the walls. A flatbed of roof trusses sits beside the framed walls while a crew works on the wall tops.Truss delivery. The truss delivery and crane truck from a low angle beside the framed home.Framed home from the corner. A corner view of the framed home with the truss bundle in the foreground and the crane at right.
Framing and crane days
Walls going up, trusses coming off the flatbed, and the roof framed in, photographed from the ground and from a drone.
Foundations from above
Concrete going in on graded pads, with the crew and mixer trucks at work.
Drone footage: foundation pours
Foundation pours from the air. Each clip loads when you press play.
Pouring the foundation. A crew places and finishes a concrete foundation with a mixer truck beside the pad.Foundation pour, corner. A crew finishing the first concrete at the corner of a foundation, seen from above.Spreading concrete. A crew spreads and screeds fresh concrete on the foundation pad.Pour beside the orchard. A pump hose and crew place concrete with a blooming almond orchard behind the site.Foundation flatwork. The crew works the poured concrete while the pump hose snakes across the pad.Wide view of the pour. A wide view of the foundation pour with the mixer truck and orchard behind.
On site, ground level
Phone clips from the crew at work on footings, floors, and walls.
Placing concrete. Crew members place concrete at the footing forms with a mixer truck in the background.Framers on the floor joists. Framers walk across the floor joists and sill plates before the walls go up.Standing a wall. A crew pushes a framed wall section upright on the foundation.Bracing the wall. The crew braces a standing wall with the other wall sections around it.Footings and mixer trucks. A crew and mixer trucks at footing forms filled with gravel and lined with vapor barrier.Footing trenches. A framer in a hard hat walks along the footing trenches before the forms go in.
Swimming pool construction
From the tied rebar cage and plumbing to the concrete shell. These are in progress shots of a pool build.
Inside the pool cage. A crew member works a hose inside the tied rebar cage of a pool excavation.
Ready to start your build?
Call (559) 474-9901 or send the form and tell us about your lot and what you want to build.